Cape Sound Progress Pictures

  

30 Days into Project (2.9.10 - 3.9.10) 

[Click on Picture Thumbnails to enlarge photos]

Overall Streetscape                                                          Building 12                                                             

cape-overall-start     cape-overall-30                               cape-bldg12-start     cape-bldg12-30

Before                                     After (30 Days)                                              Before                             After (30 Days)

S.W.P.P.P. implemented (Silt fence, streets                                        Exterior pressure washed, door hardware installed,

swept, inlet guards) overgrowth controlled,                                        roof leaks repaired, trim & siding repairs, primed &

and entire parcel area graded.                                                               painted. Building 12 Exterior - Complete

Building Details                                                              Building Courtyards

cape-detail-start     cape-detail-30                         cape-courtyard-start     cape-courtyard-30

Before                                     After (30 Days)                                        Before                After (30 days)

Mold Growth, warped trim, and rusted                                               Building courtyards had excessive mold growth

hardware (typical on all building exteriors).                                       & staining due to mositure from limited sun exposure.

All items were cleaned, repaired, & painted.

Building 16

cape-bldg16-start     cape-bldg16-30

Before                          After (30 Days)

The initial work has begun on building 16 with

securing the railing areas, roof repairs, structural

reapirs, OSB sheeting removal & window replacement.