Cape Sound Progress Pictures
30 Days into Project (2.9.10 - 3.9.10)
[Click on Picture Thumbnails to enlarge photos]
Overall Streetscape Building 12
Before After (30 Days) Before After (30 Days)
S.W.P.P.P. implemented (Silt fence, streets Exterior pressure washed, door hardware installed,
swept, inlet guards) overgrowth controlled, roof leaks repaired, trim & siding repairs, primed &
and entire parcel area graded. painted. Building 12 Exterior - Complete
Building Details Building Courtyards
Before After (30 Days) Before After (30 days)
Mold Growth, warped trim, and rusted Building courtyards had excessive mold growth
hardware (typical on all building exteriors). & staining due to mositure from limited sun exposure.
All items were cleaned, repaired, & painted.
Building 16
Before After (30 Days)
The initial work has begun on building 16 with
securing the railing areas, roof repairs, structural
reapirs, OSB sheeting removal & window replacement.